> Home    > Our Projetcs    > Natural Resources    > GM SHRUM GENERATING STATION
British Columbia, Hudson's Hope

GM SHRUM GENERATING STATION

The Gordon M. Shrum (GMS) Generating Station is a cornerstone of BC Hydro’s system and supplies about 24% of all of BC Hydro’s installed generation capacity. Located next to the W.A.C. Bennett Dam on the Peace River near Hudson’s Hope, several projects are either underway or planned to start soon that will renew aging equipment at GMS. The most substantial projects involve the replacement of turbines in five units.

Reference and photo credit: http://www.bchydro.com/index.html.

Sector(s) :

Industrial
Natural Resources

Installed System(s) :

Deluge
Detection

Project timeline :

2009 to 2010
New search Back to search results