{"id":10682,"date":"2025-09-08T23:21:18","date_gmt":"2025-09-09T03:21:18","guid":{"rendered":"https:\/\/vikingfire.ca\/?p=10682"},"modified":"2025-12-15T10:12:08","modified_gmt":"2025-12-15T15:12:08","slug":"qeii-halifax","status":"publish","type":"post","link":"https:\/\/vikingfire.ca\/fr\/qeii-halifax\/","title":{"rendered":"QEII Halifax prot\u00e9g\u00e9 contre l\u2019incendie par Protection incendie Viking Inc."},"content":{"rendered":"<h3 data-start=\"66\" data-end=\"118\">Un projet d\u2019envergure avec la s\u00e9curit\u00e9 au c\u0153ur<\/h3>\n<p data-start=\"120\" data-end=\"536\">Le QEII Halifax, prot\u00e9g\u00e9 contre l\u2019incendie par Protection incendie Viking, fait partie du plus grand projet d\u2019infrastructure en sant\u00e9 jamais entrepris dans les Maritimes. Cette nouvelle tour de soins aigus augmentera la capacit\u00e9, ajoutera des espaces m\u00e9dicaux essentiels et offrira des services de pointe aux N\u00e9o-\u00c9cossais, tout en \u00e9tant prot\u00e9g\u00e9e par des syst\u00e8mes de protection incendie de calibre industriel.<\/p>\n<h3 data-start=\"538\" data-end=\"601\">Le r\u00f4le de Viking pour prot\u00e9ger le QEII Halifax<\/h3>\n<p data-start=\"603\" data-end=\"826\">Le <a href=\"https:\/\/vikingfire.ca\/fr\/?post_type=location&amp;p=1658\">bureau de Dartmouth de Protection incendie Viking<\/a>, a \u00e9t\u00e9 choisi pour concevoir, installer et mettre en service les syst\u00e8mes de protection incendie requis pour le QEII Halifax. L\u2019ampleur du projet comprend :<\/p>\n<ul data-start=\"828\" data-end=\"1037\">\n<li data-start=\"828\" data-end=\"864\">\n<p data-start=\"830\" data-end=\"864\"><strong>Plus de 12 000 t\u00eates de gicleurs<\/strong><\/p>\n<\/li>\n<li data-start=\"865\" data-end=\"891\">\n<p data-start=\"867\" data-end=\"891\"><strong>Deux pompes \u00e0 incendie<\/strong><\/p>\n<\/li>\n<li data-start=\"892\" data-end=\"943\">\n<p data-start=\"894\" data-end=\"943\"><strong>Plus de 100 syst\u00e8mes sous eau, sous air et pr\u00e9action<\/strong><\/p>\n<\/li>\n<li data-start=\"944\" data-end=\"987\">\n<p data-start=\"946\" data-end=\"987\"><strong>Des <a href=\"https:\/\/vikingfire.ca\/fr\/solutions\/risques-speciaux\/\">syst\u00e8mes sp\u00e9cialis\u00e9s de suppression<\/a><\/strong><\/p>\n<\/li>\n<li data-start=\"988\" data-end=\"1037\">\n<p data-start=\"990\" data-end=\"1037\"><strong>Un syst\u00e8me de mousse d\u00e9di\u00e9 pour l\u2019h\u00e9lisurface<\/strong><\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1039\" data-end=\"1281\">Les travaux d\u2019installation d\u00e9buteront en 2026 et se termineront en 2030. Ce projet d\u2019envergure mobilisera environ<strong> 20 membres<\/strong> de l\u2019\u00e9quipe Protection incendie Viking afin d\u2019assurer que le QEII Halifax demeure pleinement prot\u00e9g\u00e9 contre l\u2019incendie.<\/p>\n<div id=\"attachment_10857\" style=\"width: 712px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-10857\" class=\"wp-image-10857\" src=\"https:\/\/vikingfire.ca\/wp-content\/smush-webp\/2025\/09\/qeii-fire-protection-plan-300x250.png.webp\" alt=\"fire Protection Sketch QEII\" width=\"702\" height=\"584\" title=\"\" srcset=\"https:\/\/vikingfire.ca\/wp-content\/smush-webp\/2025\/09\/qeii-fire-protection-plan-300x250.png.webp 300w, https:\/\/vikingfire.ca\/wp-content\/uploads\/2025\/09\/qeii-fire-protection-plan.png 713w\" sizes=\"auto, (max-width: 702px) 100vw, 702px\" \/><p id=\"caption-attachment-10857\" class=\"wp-caption-text\">Image 1: Rendu de protection incendie par Philip Barnes<\/p><\/div>\n<h3 data-start=\"1283\" data-end=\"1355\"><\/h3>\n<h3 data-start=\"1283\" data-end=\"1355\">L\u2019importance d\u2019un \u00e9tablissement de sant\u00e9 prot\u00e9g\u00e9 contre l\u2019incendie<\/h3>\n<p data-start=\"1357\" data-end=\"1719\">Le QEII Halifax\u00a0visera non seulement la conformit\u00e9 aux normes de s\u00e9curit\u00e9 les plus strictes, mais prot\u00e9gera \u00e9galement les patients, le personnel et les visiteurs dans un environnement de soins critiques. La protection incendie constitue une base essentielle de toute <a href=\"https:\/\/vikingfire.ca\/fr\/industry\/secteur-de-la-sante\/\">infrastructure en sant\u00e9<\/a>, permettant aux op\u00e9rations de se poursuivre sans compromis.<\/p>\n<blockquote data-start=\"1721\" data-end=\"2158\">\n<p data-start=\"1723\" data-end=\"2158\"><strong><em>\u00ab Protection incendie Viking est \u00e0 l\u2019avant-garde de la protection incendie dans les Maritimes depuis plus de 40 ans, et ce projet viendra renforcer notre position sur le march\u00e9. Nous sommes v\u00e9ritablement honor\u00e9s de faire partie de ce projet phare, qui offrira des soins de sant\u00e9 de pointe aux N\u00e9o-\u00c9cossais, non seulement dans un avenir rapproch\u00e9, mais pour des g\u00e9n\u00e9rations \u00e0 venir. \u00bb <\/em><\/strong>\u2014 Jesse Klups, Vice-pr\u00e9sident, Protection incendie Viking<\/p>\n<div id=\"attachment_10662\" style=\"width: 712px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-10662\" class=\"wp-image-10662\" src=\"https:\/\/vikingfire.ca\/wp-content\/smush-webp\/2025\/08\/viking-dartmouth-qeii-project-team-1024x690.jpg.webp\" alt=\"\u00c9quipe de Viking Dartmouth en actionViking Dartmouth Team\" width=\"702\" height=\"473\" title=\"\" srcset=\"https:\/\/vikingfire.ca\/wp-content\/smush-webp\/2025\/08\/viking-dartmouth-qeii-project-team-1024x690.jpg.webp 1024w, https:\/\/vikingfire.ca\/wp-content\/smush-webp\/2025\/08\/viking-dartmouth-qeii-project-team-300x202.jpg.webp 300w, https:\/\/vikingfire.ca\/wp-content\/smush-webp\/2025\/08\/viking-dartmouth-qeii-project-team-768x518.jpg.webp 768w, https:\/\/vikingfire.ca\/wp-content\/smush-webp\/2025\/08\/viking-dartmouth-qeii-project-team-1536x1036.jpg.webp 1536w, https:\/\/vikingfire.ca\/wp-content\/smush-webp\/2025\/08\/viking-dartmouth-qeii-project-team-2048x1381.jpg.webp 2048w\" sizes=\"auto, (max-width: 702px) 100vw, 702px\" \/><p id=\"caption-attachment-10662\" class=\"wp-caption-text\">Image 2 : \u00c9quipe de Viking Dartmouth en action<\/p><\/div>\n<p>&nbsp;<\/p><\/blockquote>\n<h3 data-start=\"2160\" data-end=\"2199\">Soutenir des g\u00e9n\u00e9rations de soins<\/h3>\n<p data-start=\"2160\" data-end=\"2199\">Une fois termin\u00e9e, la nouvelle tour ajoutera <strong>216 lits<\/strong>, <strong>16 salles d\u2019op\u00e9ration<\/strong>, un <strong>d\u00e9partement d\u2019urgence \u00e9largi<\/strong> ainsi que des espaces de <strong>laboratoire et d\u2019imagerie m\u00e9dicale de pointe<\/strong>. Gr\u00e2ce \u00e0 ces ajouts, et avec le <a href=\"https:\/\/www.nshealth.ca\/locations-and-facilities\/halifax-infirmary\" target=\"_blank\" rel=\"noopener\">QEII Halifax<\/a> prot\u00e9g\u00e9 contre l\u2019incendie, la province sera mieux outill\u00e9e pour offrir des soins plus s\u00e9curitaires et plus efficaces pour les d\u00e9cennies \u00e0 venir.<\/p>\n<div id=\"attachment_10865\" style=\"width: 730px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-10865\" class=\"wp-image-10865\" src=\"https:\/\/vikingfire.ca\/wp-content\/uploads\/2025\/09\/image007-300x214.webp\" alt=\"QEII Halifax\" width=\"720\" height=\"514\" title=\"\" srcset=\"https:\/\/vikingfire.ca\/wp-content\/uploads\/2025\/09\/image007-300x214.webp 300w, https:\/\/vikingfire.ca\/wp-content\/uploads\/2025\/09\/image007.webp 726w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><p id=\"caption-attachment-10865\" class=\"wp-caption-text\">Image 3 : Rendu du QEII Halifax<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Un projet d\u2019envergure avec la s\u00e9curit\u00e9 au c\u0153ur Le QEII Halifax, prot\u00e9g\u00e9 contre l\u2019incendie par Protection incendie Viking, fait partie du plus grand projet d\u2019infrastructure en sant\u00e9 jamais entrepris dans les Maritimes. Cette nouvelle tour de soins aigus augmentera la capacit\u00e9, ajoutera des espaces m\u00e9dicaux essentiels et offrira des services de pointe aux N\u00e9o-\u00c9cossais, tout [&hellip;]<\/p>\n","protected":false},"author":16,"featured_media":10687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[39],"tags":[77,66,78],"class_list":["post-10682","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projets","tag-infrastructure-en-sante","tag-protection-incendie-viking","tag-qeii-halifax-fr","cf"],"acf":[],"_links":{"self":[{"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/posts\/10682","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/comments?post=10682"}],"version-history":[{"count":5,"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/posts\/10682\/revisions"}],"predecessor-version":[{"id":11969,"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/posts\/10682\/revisions\/11969"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/media\/10687"}],"wp:attachment":[{"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/media?parent=10682"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/categories?post=10682"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vikingfire.ca\/fr\/wp-json\/wp\/v2\/tags?post=10682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}